- Email: info@jaya-am.com
Routine Maintenance
Controller Center
Elevator controller
Suspended tooling, with tools mounted in order. The workshop has wide vision and has automatic simulation test and 100% full function inspection.
Escalator controller
Unit operation in pre-material configuration mode. The workshop has automatic simulation test and 100% full function inspection.
Human interface
The workshop uses the ball flow line, the front working platform and the rear material storage, which reduces the material handling time and has automatic simulation test as well as 100% full function inspection.
Routine Maintenance
Intelligent Manufacturing Command Center
- Contract scheduling requirements
- Technology release status
- Material arrival status
- Parts production process
- Product quality status
- Equipment operating status
- Storage situation
- Overall delivery process
- Contract scheduling requirements
- Technology release status
- Material arrival status
- Parts production process
- Product quality status
- Equipment operating status
- Storage situation
- Overall delivery process